  Tec mold appoints a project manager to each individual project and client. The project manager is in charge of the entire project from start to finish providing direct communication for the client. All project management teams communicate in English and are qualified engineers. Our professionally trained and well-connected teams will ensure you receive high quality products and consistent service, which in turn, will help you maintain a competitive advantage over your competitors.
 
  Weekly program reports with digital pictures will keep customer informed every latest status of project and it is easy for customer to control the everything at the same time. As far as customer care concerned, we take great pride in the high standard of customer service offered by Tec mold. Just one phone call, or e-mail to us and you'll see we are ready for you at any time. Teaming up with a project manager and quality engineers, we ensure that projects development transit smoothly from the engineering side to the production.
 
Project Management Flow Chart
For your any project, we have an integrated and scientific procedure from RFQ to project finish.
Customer RFQ.
Our sale team will response to your any question at any time. Our professional mold engineer team will quote according to the customer drawing with request within 2 days.
Mold Design.
Our sales and engineers relative with the project should have a meeting for every project at the beginning. We should review the desgin carefully and optimize the mold design according to customer request and product characteristic.
Mold Layout. We should sent you a mold assembly drawing for your approval.
Purchase steel and resin.
Once get your approval for layout, we should start to design components drawing of mold and purchase mold steel and the material for trial.
Schedule. Keeping track of the production schedule
Mold Making. Mould making as commitment schedule.
Mold Trial and Sampling Submitted. Mould trial as commitment date,and Samples are submitted with a detailed inspection report.
Confirm Sample.
Check final sample according to specifications and confirm it
Packaging. Tooling finished and export mold package inspection(such as Material Certificate, Spare Part for Damageable, Electrode, Whole Digital and Writing Document, etc)
Delivery: Project accomplished


 
 
  mold making
  molding
  rapid prototype
  die casting
  quality control
  project management
  facility

 

All rights reserved.1999-2006 ShenZhen TEC Mold Industrial Limited.
Tel:86-755-81769158 ; Fax:86-755-81769258 ; E-mail: sales@tecmold.com
景荣精密模具(深圳)有限公司 版权所有